REQUIREMENTS

Residential

NEW CONNECTION

  • 2 Valid Identifications with picture and signature
  • 1×1 Picture
  • Community Tax Certificate CTC or Cedula
  • Police Clearance or Barangay Clearance
  • Fire Safety Inspection Certificate
  • Load Schedule with Electrical Plan (sealed and signed by Professional Electrical Engineer
  • Electrical Permit and Certificate of Final Electrical Inspection (CFEI) from the City or Municipal Engineer’s Office
  • Reservation slip of Calibrated Electric Meter from ALCE Power Builders
  • Original and Photocopy of Proof of Ownership or Occupancy (e.g. Transfer Certificate of Title, Notarized Deed of Sale or Lease Contract etc.)
 
 
 

** For representative (Authorization letter and valid ID of Representative)

Commercial & Government

NEW CONNECTION

      • 2 Valid Identifications with picture and signature
      • 1×1 Picture
      • Community Tax Certificate CTC or Cedula
      • Police Clearance or Barangay Clearance
      • Fire Safety Inspection Certificate
      • Load Schedule with Electrical Plan (sealed and signed by Professional Electrical Engineer
      • Electrical Permit and Certificate of Final Electrical Inspection (CFEI) from the City or Municipal Engineer’s Office
      • Reservation slip of Calibrated Electric Meter from ALCE Power Builders
      • Copy of SEC Registration with Articles of Incorporation / DTI Registration or Mayor’s Permit
      • Original and Photocopy of Proof of Ownership or Occupancy (e.g. Transfer Certificate of Title, Notarized Deed of Sale or Lease Contract etc.)

    ** For representative (Authorization letter and valid ID of Representative)

TEMPORARY CONNECTION

    • 2 Valid Identifications with picture and signature
    • 1×1 Picture
    • Community Tax Certificate CTC or Cedula
    • Police Clearance or Barangay Clearance
    • Temporary Fire Safety Inspection Certificate
    • Temporary Load Schedule with Electrical Plan (sealed and signed by Professional Electrical Engineer)
    • Temporary Electrical Permit from the City or Municipal Engineer’s Office
    • Reservation slip of Calibrated Electric Meter from ALCE Power Builders
    • Original and Photocopy of Proof of Ownership or Occupancy (e.g. Transfer Certificate of Title, Notarized Deed of Sale or Lease Contract etc.)

** For representative (Authorization letter and valid ID of Representative)

TEMPORARY CONNECTION

    • 2 Valid Identifications with picture and signature
    • 1×1 Picture
    • Community Tax Certificate CTC or Cedula
    • Police Clearance or Barangay Clearance
    • Temporary Fire Safety Inspection Certificate
    • Temporary Load Schedule with Electrical Plan (sealed and signed by Professional Electrical Engineer)
    • Temporary Electrical Permit from the City or Municipal Engineer’s Office
    • Reservation slip of Calibrated Electric Meter from ALCE Power Builders
    • Original and Photocopy of Proof of Ownership or Occupancy (e.g. Transfer Certificate of Title, Notarized Deed of Sale or Lease Contract etc.)

** For representative (Authorization letter and valid ID of Representative)

RECONNECTION

    • Electric Bill
    • Valid ID
** For representative (Authorization letter and valid ID of Representative)

RECONNECTION

    • Electric Bill
    • Valid ID
** For representative (Authorization letter and valid ID of Representative)

PERMANENT CONNECTION

    • Barangay Clearance
    • Cedula
    • Electrical Permit & Certificate of Final electrical Inspection
    • Load Schedule with seal and signature of certified Professional Electrical Engineer
    • Fire Safety Inspection Certificate
    • Statement of Account/ Electric Bill
    • 2 Valid Identifications with picture and signature
    • Original and Photocopy of Proof of Ownership or Occupancy (e.g. Transfer Certificate of Title, Notarized Deed of Sale or Lease Contract etc.)

** For representative (Authorization letter and valid ID of Representative)

PERMANENT CONNECTION

    • Barangay Clearance
    • Cedula
    • Electrical Permit & Certificate of Final electrical Inspection
    • Load Schedule with seal and signature of certified Professional Electrical Engineer
    • Fire Safety Inspection Certificate
    • Statement of Account/ Electric Bill
    • 2 Valid Identifications with picture and signature
    • Original and Photocopy of Proof of Ownership or Occupancy (e.g. Transfer Certificate of Title, Notarized Deed of Sale or Lease Contract etc.)

** For representative (Authorization letter and valid ID of Representative)

Senior Citizen

DISCOUNT

    • Valid Senior Citizen’s ID (Photocopy)
    • Electric Bill (Photocopy)
    • Barangay Certificate

** For representative (valid ID of Representative)

For further assistance, please contact our Customer Service at:

Tel No: (043) 727 – 3020 / Mob No: 0998 – 8413520 or visit us at FBPC BLDG. Kapt. Ponso Ext. Pob II, Bauan, Batangas